Refitting Jubilee: Projects, Upgrades, & Dockside Mishaps

Refitting Jubilee: Projects, Upgrades, & Dockside Mishaps

With Jubilee tied up at the dock for a stretch, we decided to take full advantage of the downtime. What started as a simple list of maintenance items quickly expanded into a full-scale boat refit—ranging from major solar power upgrades to safety additions and, of course, a few unexpected dockside swim lessons along the way! Interested in where we are? Our live tracking page is back up!

The Great Trampoline Splashdown

One of the first projects on our list was replacing the worn-out trampolines at the bow. The first side went on without a hitch—everything went smoothly, stretched tight, and looked brand new. Then we moved on to the second side.

We had repeatedly reminded the kids that the bow was strictly off-limits while we were working. We had just removed the old material and were starting to string up the new net when William decided to make a dash across it. The unlaced material gave out instantly, sending him splashing right down into the water!

Startled but completely unharmed, Pamela didn’t hesitate—she jumped right into the icky Port Everglades water after him and passed him up to me.

Pamela climbs up the bridle after jumping into the water to help William, who fell through the trampoline during its replacement.
Pamela climbs up the bridle after jumping into the water to help William, who fell through the trampoline during its replacement.
William, always making us smile.
William, always making us smile.

Deck Prep, Safety Nets, & Cosmetic Details

Once the new trampolines were securely laced, we shifted focus to safety and cosmetics around the deck. With three energetic boys on board, adding extra peace of mind is always high on our priority list.

Sealing the lifeline netting with a hot knife.
Sealing the lifeline netting with a hot knife.
Securing the new lifeline netting to the stanchions.
Securing the new lifeline netting to the stanchions.

Alongside the netting, we tackled several structural and storage improvements:

  • Deck Repairs & Through-Hulls: Did some custom epoxy work to repair worn deck areas and re-bed a loose through-deck fitting that was letting moisture seep in.
  • Inflatable Fender Upgrade: Swapped out our bulky traditional fenders for compact inflatable ones. Our old rigid ones used to completely consume an entire large storage locker!
  • Outdoor Shower & Window Prep: Replaced the worn-out outdoor shower head on the transom and spent time freshening up the black border trim around the windows for a clean, sharp look.
Deck repairs underway with some fresh epoxy work.
Deck repairs underway with some fresh epoxy work.
Applying a fresh coat to the black window borders.
Applying a fresh coat to the black window borders.

Supercharging the Electrical System (4,200W Solar!)

The biggest game-changer for our offshore independence has been our complete power system overhaul, worked in partnership with Just Catamarans. Our goal was simple: make Jubilee completely self-sufficient so we can run the entire boat—including air conditioning and heavy appliances—straight off our battery bank without needing the generator.

  • Solar Capacity Boost: Expanding our system from 900W to a massive 4,200W array mounted on a new custom solar arch.
  • Inverter System: Installed dual Mastervolt inverters, seamlessly converting our heavy solar generation into pure sine-wave power.
  • Interior Upgrades: Swapped out old AC wall outlets throughout the living areas for modern units featuring built-in high-speed USB-C charging ports.
One of our two new Mastervolt inverters: full boat power straight from the battery bank.
One of our two new Mastervolt inverters: full boat power straight from the battery bank.
Our boat buddy Frank teasing us that the new solar rack could double as a downwind sail.
Our boat buddy Frank teasing us that the new solar rack could double as a downwind sail.
Solar array installation: maneuvering the panels into place.
Solar array installation: maneuvering the panels into place.
Our new solar array installation in progress.
Our new solar array installation in progress.
Installing our massive new solar array.
Installing our massive new solar array.
Solar power and shade on the back deck.
Solar power and shade on the back deck.

Engine Maintenance & Upcoming Haul-Out

No refit period is complete without getting your hands dirty in the engine room. We checked off the intensive 1,000-hour service on both of our diesel engines—inspecting impellers, changing filters, flushing heat exchangers, and replacing fluids to ensure mechanical reliability for our next passage.

What’s Next for Jubilee?

Next up on the schedule is hauling the boat out of the water to repaint the bottom hull with fresh anti-fouling paint and replace a few below-waterline through-hulls. With 4.2kW of solar, upgraded inverters, and fresh engines, we are beyond excited to unplug from the dock and live completely off-grid!

Leave a Reply

Your email address will not be published. Required fields are marked *